Tag Archives: Recycling our waste

Bulk waste green waste Recycling our waste

verco  |  powering the evolution

Verco is the booking and collection management software delivering our innovative pre-booked services. Developed in-house on the back of over a decades worth of waste management experience, improved by daily feedback from clients, residents and staff alike. We are able to produce a tailored experience for the nuances of each client and each contract.

Read More Carrot icon
graphic graphic

Slurry Microtunnelling and Civil Works

With innovative relining technology and a skilled team, we’re your trusted partner for all pipeline services. Our experience and diverse capabilities enable us to deliver solutions where others can’t, using multiple methods and processes to achieve the best results.

Our Recent Projects

To see what we can do for you, it’s a good idea to see what we’ve done for others. We’re proud of every project we work on,

View All Our Recent Projects

Contact Us

D&M thrives on delivering the right solution for the right application, please contact our sales office for the right solution.

Recycling our waste

The RMF Plastics Technology stream

The leaders in Slurry Microtunnelling and Civil Works

Read More Carrot icon
graphic graphic

Details

Description

Aaro ensured safe and efficient construction of essential infrastructure, including an in-situ headwall and integration of a new DN800 pipe section.

Aaro is pleased to announce the successful award and completion of the contract for the Neerabup Water Reservoir Overflow upgrade.

The project included the construction of an in-situ headwall connected to the existing parapet wall, as well as the integration of a new DN800 pipe section with the current overflow pipework.

Key aspects of the project included:

  • Providing safe excavation
  • Constructing a dust-proof barrier to prevent foreign contamination of drinking water
  • Engaging a specialized welding contractor
  • Completing formwork and concrete works
  • Installing a precast cover
  • Expanding or constructing an emergency spillway with stone pitching

The works were completed on time and within budget, reflecting Aaro’s commitment to delivering high-quality infrastructure projects efficiently and effectively.

Summary

$367

Total Net Volume

Client
Water Corporation
Location
Neerabup Reservoir
Project Duration
1 Month
Project Start
December 2023
Project Finish
January 2024

Gallery

>
Featured Modal Image

Talk to our Construction Experts

We support our clients when they need it most. Contact our experts to see how Aaro can partner with your business.